Sunday 30 November 2014

Front Wall Finished

I bought three more shiplap planks and managed to finish the front exterior today. It still needs a couple more coats of stain and some sealing strips around the edges, but the construction work is complete. Solid as a solid thing, and looking good.


Next comes the internal cladding, but I'm putting the electrics in first so that I can chase the cables into the insulation before fixing the internal surface and sealing it all up.

A two-way consumer unit with 16A breaker for ring mains and 6A breaker for the lighting circuit has been fitted just inside the door and the incoming supply to the temporary socket needs to be fed via a kWh meter to the consumer unit so I can keep tabs on 'leccy usage and pay Eco for the power I use. I don't anticipate a huge amount of imported electricity as I shall have the solar panels for lighting and low consumption circuits.


I even fitted an exterior bulkhead light to illuminate the entrance and the area outside the door. I'm debating whether to fit an awning/porch over the front...I shall see how it goes once we get bad weather. For the moment, the exterior is as finished as it needs to be, bar the final staining.



No comments: