Tuesday 26 May 2015

Some More Photos Of Progress


Just a few photos of the office by way of an update. Ewww....the lens on my camera really is a bit fish-eye, isn't it? It's not the van that's warped - trust me! Another coat of stain and varnish on the external woodwork. You can see the guttering running around the perimeter of the roof. We've not had much rain in the last few days so the ground outside the van is quite firm now.


The guttering goes round the van in a complete loop, so has a surface area of around 2 square metres.


Here you can see the 21.5mm PVC pipe that channels the water into the filter unit. The overflow pipe prevents the storage tank from overfilling.


Looking good now. We really must turn our attention to the woodwork and metalwork shops next now that we have some good weather.

Internally, the second coat is finished on the kitchen floor, I've swept up most of the sawdust, cut the architrave to trim along the front wall once it is clad and the loo has had it's first bucket-change so it's all smelling sweet and freshly painted. I also put a couple of screws up near the top of the partition wall to hang the speakers on. Less shelf-space taken up and more room for stuff.


Shot taken through the front window, hence some reflection and smearing. I still have the compound mitre saw in the office area, but other than that, the floor is pretty clear now. I need to get some more floor paint to do the main office area although the edges have already been cut in.


No comments:

Post a Comment