Wednesday, 18 November 2015

Finish Line In Sight

I did mean to do another update on Sunday, but what with one thing and another, I didn't get a round tuit.

Progress? I fitted the last of the skirting trim to the two sides and the office area is looking more tidy now. I have a few damp issues, but the dehumidifier is generating output and the carpet is waterproof and rot-proof so any dampness shouldn't cause a long term problem. I think it's the driving rain and wind that is pushing damp into the cracks and crevices and as soon as I get a few dry days, I need to finally caulk up any gaps and finish weather-sealing a couple of last small holes in the roof trim.

I have also replaced the 13W CFL in the kitchen with an 8W LED bulb. I wasn't expecting miracles but I have to admit I'm rather impressed. Firstly, it is a 'warm white' lamp so the light isn't as harsh and as blue as the GU10 LED spotlights in the office. Secondly, being LED and essentially a regulated DC system, the light doesn't suffer from voltage fluctuations at the end of the long line when using power tools or the kettle. That doesn't seem like a big deal, but it makes a difference.

To finish the otherwise bare window, I fitted a cheap B&Q Colours roller blind. Looks a lot more cosy now with the blind down. 


So a bit more weatherproofing to finish, dry out the box a little, finish a little trimming between the front wall and the sides, finish cladding the loo and then one last section of ceiling insulation to install and then that's most of the hard work done. I still need another fiddle with the phone line...I picked up my messages having rejigged the connections, and half an hour later the line was dead again!


No comments:

Post a Comment