I've not seen the office for a week. I've been working on an eco-build over at Llanafan.
I've never done dry-lining or ceilings before. I think I'm getting the hang of it.
Energy saving advice: Insulate, insulate, and then insulate some more.
Floor poured. The whole downstairs has underfloor heating.
The entire roof space apart from the area over the balcony has been insulated to a depth of 300mm with lagging made from spun plastic milk bottles.
No comments:
Post a Comment